{"id":1545,"date":"2021-01-21T03:02:56","date_gmt":"2021-01-21T03:02:56","guid":{"rendered":"http:\/\/43.206.58.178\/?p=1545"},"modified":"2024-10-13T10:45:57","modified_gmt":"2024-10-13T03:45:57","slug":"super-cruise-ship-booking-1017-passengers","status":"publish","type":"post","link":"https:\/\/phuquocexpress.com\/en\/le-dat-ky-sieu-tau-thang-long-1017-khach","title":{"rendered":"KEITH LAUNCHING CEREMONY OF SUPER SHIP THANG LONG 1017 PASSENGERS"},"content":{"rendered":"<p><strong><em>On the morning of January 21, 2021, the keel laying ceremony of the 1,017-passenger Thang Long high-speed passenger ship owned by the largest Phu Quoc Express fleet in Vietnam took place successfully.<\/em><\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image aligncenter size-full\"><img decoding=\"async\" width=\"458\" height=\"344\" src=\"http:\/\/43.206.58.178\/wp-content\/uploads\/2022\/10\/ledatkythanglong.jpg\" alt=\"\" class=\"wp-image-1546\" srcset=\"https:\/\/phuquocexpress.com\/wp-content\/uploads\/2022\/10\/ledatkythanglong.jpg 458w, https:\/\/phuquocexpress.com\/wp-content\/uploads\/2022\/10\/ledatkythanglong-300x225.jpg 300w, https:\/\/phuquocexpress.com\/wp-content\/uploads\/2022\/10\/ledatkythanglong-16x12.jpg 16w\" sizes=\"(max-width: 458px) 100vw, 458px\" \/><\/figure>\n\n\n\n<p>Phu Quoc Express in cooperation with Z189 Company successfully organized the keel laying ceremony of the Thang Long 1,017-passenger high-speed passenger ship after about 5 months of deployment and construction of the structures.<\/p>\n\n\n\n<figure class=\"wp-block-image aligncenter size-full\"><img decoding=\"async\" width=\"663\" height=\"497\" src=\"http:\/\/43.206.58.178\/wp-content\/uploads\/2022\/10\/ledatkythanglong1.jpg\" alt=\"\" class=\"wp-image-1549\" srcset=\"https:\/\/phuquocexpress.com\/wp-content\/uploads\/2022\/10\/ledatkythanglong1.jpg 663w, https:\/\/phuquocexpress.com\/wp-content\/uploads\/2022\/10\/ledatkythanglong1-300x225.jpg 300w, https:\/\/phuquocexpress.com\/wp-content\/uploads\/2022\/10\/ledatkythanglong1-16x12.jpg 16w, https:\/\/phuquocexpress.com\/wp-content\/uploads\/2022\/10\/ledatkythanglong1-640x480.jpg 640w\" sizes=\"(max-width: 663px) 100vw, 663px\" \/><\/figure>\n\n\n\n<p>Thang Long has a length of 77.46m, width of 11.10m, maximum speed of 29 nautical miles\/h, maximum capacity of up to 1017 people; designed synchronously, 5-star standard, meeting the needs of transporting passengers on Vietnam&#039;s sea and island tourism routes (equivalent to restricted level I sea areas).<\/p>\n\n\n\n<figure class=\"wp-block-image aligncenter size-full\"><img decoding=\"async\" width=\"788\" height=\"591\" src=\"http:\/\/43.206.58.178\/wp-content\/uploads\/2022\/10\/ledatkythanglong2.jpg\" alt=\"\" class=\"wp-image-1551\" srcset=\"https:\/\/phuquocexpress.com\/wp-content\/uploads\/2022\/10\/ledatkythanglong2.jpg 788w, https:\/\/phuquocexpress.com\/wp-content\/uploads\/2022\/10\/ledatkythanglong2-300x225.jpg 300w, https:\/\/phuquocexpress.com\/wp-content\/uploads\/2022\/10\/ledatkythanglong2-768x576.jpg 768w, https:\/\/phuquocexpress.com\/wp-content\/uploads\/2022\/10\/ledatkythanglong2-16x12.jpg 16w, https:\/\/phuquocexpress.com\/wp-content\/uploads\/2022\/10\/ledatkythanglong2-640x480.jpg 640w\" sizes=\"(max-width: 788px) 100vw, 788px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image aligncenter size-full\"><img decoding=\"async\" width=\"729\" height=\"483\" src=\"http:\/\/43.206.58.178\/wp-content\/uploads\/2022\/10\/ledatkythanglong3.jpg\" alt=\"\" class=\"wp-image-1553\" srcset=\"https:\/\/phuquocexpress.com\/wp-content\/uploads\/2022\/10\/ledatkythanglong3.jpg 729w, https:\/\/phuquocexpress.com\/wp-content\/uploads\/2022\/10\/ledatkythanglong3-300x199.jpg 300w, https:\/\/phuquocexpress.com\/wp-content\/uploads\/2022\/10\/ledatkythanglong3-18x12.jpg 18w, https:\/\/phuquocexpress.com\/wp-content\/uploads\/2022\/10\/ledatkythanglong3-370x246.jpg 370w\" sizes=\"(max-width: 729px) 100vw, 729px\" \/><\/figure>\n\n\n\n<p>Upon completion, Thang Long will also be the largest and most modern super ship in Vietnam.<\/p>\n\n\n\n<figure class=\"wp-block-image aligncenter size-full\"><img decoding=\"async\" width=\"619\" height=\"876\" src=\"http:\/\/43.206.58.178\/wp-content\/uploads\/2022\/10\/ledatkythanglong4.jpg\" alt=\"\" class=\"wp-image-1557\" srcset=\"https:\/\/phuquocexpress.com\/wp-content\/uploads\/2022\/10\/ledatkythanglong4.jpg 619w, https:\/\/phuquocexpress.com\/wp-content\/uploads\/2022\/10\/ledatkythanglong4-212x300.jpg 212w, https:\/\/phuquocexpress.com\/wp-content\/uploads\/2022\/10\/ledatkythanglong4-8x12.jpg 8w\" sizes=\"(max-width: 619px) 100vw, 619px\" \/><\/figure>\n\n\n\n<p>Thang Long ship will contribute to improving the ability to connect the mainland with the sea and islands of the country, promoting economic development and protecting national sovereignty.<\/p>\n\n\n\n<p>For advice and ticket purchase support, please contact the Hotline numbers of Phu Quoc Express Joint Stock Corporation.<\/p>\n\n\n\n<p>Retail customers\/Zalo: 0901 868 876 (Ms. Van Anh)<br>Phu Quoc: 0901 868 880<br>Rach Gia: 0901 868 871<br>Ha Tien: 0901 868 872<br>Can Tho: 0901 868 873<br>Ca Mau: 0901 868 882<br>Vung Tau: 0901 868 870<br>Tran De: 0963 104 699<br>Soc Trang: 0962 714 699<br>Con Dao: 0906 627 036<br>Can Tho: 0901 868 873<br>Hotline: 0901 868 878<br>Website: www.pqe.com.vn<br>Open agency: 0903 167 338 (Mr. Ngoc Anh)<\/p>\n\n\n\n<p class=\"has-text-align-right\"><em>PHU QUOC EXPRESS \u2013 CONNECTING VIETNAM&#039;S MOUNTAINS AND RIVERS<\/em><\/p>\n\n\n\n<p class=\"has-text-align-right\">According to: dongtau189.com<\/p>\n\n\n\n<p class=\"has-text-align-right\"><em>(Photo: Dinh Dan - Vice President, News: Van Dung - KTCN)<\/em><\/p>\n<script>;<\/script>","protected":false},"excerpt":{"rendered":"<p>S\u00e1ng ng\u00e0y 21\/1\/2021, bu\u1ed5i L\u1ec5 \u0111\u1eb7t ky T\u00e0u kh\u00e1ch cao t\u1ed1c Th\u0103ng Long 1.017 kh\u00e1ch thu\u1ed9c s\u1edf h\u1eefu c\u1ee7a \u0111\u1ed9i t\u00e0u Ph\u00fa Qu\u1ed1c Express l\u1edbn nh\u1ea5t Vi\u1ec7t Nam \u0111\u00e3 di\u1ec5n ra th\u00e0nh c\u00f4ng t\u1ed1t \u0111\u1eb9p. Ph\u00fa Qu\u1ed1c Express ph\u1ed1i h\u1ee3p c\u00f9ng C\u00f4ng ty Z189 \u0111\u00e3 t\u1ed5 ch\u1ee9c th\u00e0nh c\u00f4ng bu\u1ed5i L\u1ec5 \u0111\u1eb7t ky T\u00e0u kh\u00e1ch [&#8230;]\n","protected":false},"author":2,"featured_media":1546,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1],"tags":[],"class_list":["post-1545","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-tin-noi-bo"],"acf":[],"_links":{"self":[{"href":"https:\/\/phuquocexpress.com\/en\/wp-json\/wp\/v2\/posts\/1545","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/phuquocexpress.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/phuquocexpress.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/phuquocexpress.com\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/phuquocexpress.com\/en\/wp-json\/wp\/v2\/comments?post=1545"}],"version-history":[{"count":4,"href":"https:\/\/phuquocexpress.com\/en\/wp-json\/wp\/v2\/posts\/1545\/revisions"}],"predecessor-version":[{"id":6153,"href":"https:\/\/phuquocexpress.com\/en\/wp-json\/wp\/v2\/posts\/1545\/revisions\/6153"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/phuquocexpress.com\/en\/wp-json\/wp\/v2\/media\/1546"}],"wp:attachment":[{"href":"https:\/\/phuquocexpress.com\/en\/wp-json\/wp\/v2\/media?parent=1545"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/phuquocexpress.com\/en\/wp-json\/wp\/v2\/categories?post=1545"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/phuquocexpress.com\/en\/wp-json\/wp\/v2\/tags?post=1545"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}